South San Diego County Water Reclamation Project of 2011 - Amends the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior, in cooperation with the Sweetwater Authority, Otay Water District, and the city of Chula Vista, California, to participate in phase one of a project to design, plan, and construct permanent facilities needed to reclaim, reuse, and treat groundwater and wastewater in the service area of Sweetwater Authority, Otay Water District, and the city of Chula Vista. Limits the federal share of the project to 25% of the total cost.
[Congressional Bills 112th Congress]
[From the U.S. Government Publishing Office]
[H.R. 917 Introduced in House (IH)]
112th CONGRESS
1st Session
H. R. 917
To amend the Reclamation Wastewater and Groundwater Study and
Facilities Act to authorize the Secretary of the Interior to
participate in phase one of the South San Diego County Water
Reclamation Project, and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
March 3, 2011
Mr. Filner introduced the following bill; which was referred to the
Committee on Natural Resources
_______________________________________________________________________
A BILL
To amend the Reclamation Wastewater and Groundwater Study and
Facilities Act to authorize the Secretary of the Interior to
participate in phase one of the South San Diego County Water
Reclamation Project, and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``South San Diego County Water
Reclamation Project of 2011''.
SEC. 2. PROJECT AUTHORIZATION.
(a) In General.--The Reclamation Wastewater and Groundwater Study
and Facilities Act (Public Law 102-575, title XVI; 43 U.S.C. 390h et
seq.) is amended by adding after the last section the following:
``SEC. 16__. PHASE ONE OF THE SOUTH SAN DIEGO COUNTY WATER RECLAMATION
PROJECT, CALIFORNIA.
``(a) Authorization.--The Secretary, in cooperation with the
Sweetwater Authority, Otay Water District, and the City of Chula Vista,
California, is authorized to participate in phase one of a project to
design, plan, and construct permanent facilities needed to reclaim,
reuse, and treat groundwater and wastewater in the service area of
Sweetwater Authority, Otay Water District, and the City of Chula Vista.
``(b) Costsharing.--The Federal share of the cost of the project
described in subsection (a) shall not exceed 25 percent of the total
cost of the project.
``(c) Limitation.--Funds provided by the Secretary shall not be
used for the operation and maintenance of the project described in
subsection (a).
``(d) Authorization of Appropriations.--There is authorized to be
appropriated to carry out this section $20,000,000.''.
(b) Conforming Amendment.--The table of sections in section 2 of
Public Law 102-575 is amended by adding after the last item the
following:
``Sec. 16__. Phase One of the South San Diego County Water Reclamation
Project, California.''.
<all>
Introduced in House
Introduced in House
Referred to the House Committee on Natural Resources.
Referred to the Subcommittee on Water and Power.