Army Corps of Engineers Communications Accountability Act of 2013 - Requires the Chief of Engineers: (1) to notify the public within seven days after determining that runoff conditions in the Missouri River System are likely to reach the upper quartile or upper decile scenarios specified for a year in an annual operating plan for such System; and (2) to meet with a state, local, or tribal government with jurisdiction over an area that will be affected by a flood occurring in the System within seven days after such government requests such a consultation regarding such an upper decile determination. Authorizes the Chief to provide in such consultation information regarding expected water levels, advice regarding preparedness actions, and technical assistance.
[Congressional Bills 113th Congress]
[From the U.S. Government Publishing Office]
[H.R. 2742 Introduced in House (IH)]
113th CONGRESS
1st Session
H. R. 2742
To require the Army Corps of Engineers to notify the public of certain
flood predictions regarding the Missouri River System, and for other
purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
July 18, 2013
Mrs. Noem (for herself and Mr. Cramer) introduced the following bill;
which was referred to the Committee on Transportation and
Infrastructure
_______________________________________________________________________
A BILL
To require the Army Corps of Engineers to notify the public of certain
flood predictions regarding the Missouri River System, and for other
purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Army Corps of Engineers
Communications Accountability Act of 2013''.
SEC. 2. NOTIFICATION AND CONSULTATION REQUIREMENTS.
(a) In General.--If the Chief of Engineers makes an upper quartile
determination or an upper decile determination, the Chief of Engineers
shall notify the public of such determination, and consult with
affected governments, in accordance with this section.
(b) Notification.--Not later than 7 days after making a
determination described in subsection (a), the Chief of Engineers shall
notify the public that such determination has been made.
(c) Consultation.--
(1) In general.--If the Chief of Engineers makes an upper
decile determination, an affected government may request a
consultation with the Chief of Engineers.
(2) Deadline.--If an affected government requests a
consultation under paragraph (1), the Chief of Engineers shall
provide such consultation not later than 7 days after receiving
the request.
(3) Contents.--The Chief of Engineers may provide in a
consultation under this subsection--
(A) information regarding expected water levels;
(B) advice regarding appropriate preparedness
actions;
(C) technical assistance; and
(D) any other information or assistance determined
appropriate by the Chief of Engineers.
(d) Definitions.--In this section:
(1) Affected government.--The term ``affected government''
means a State, local, or tribal government with jurisdiction
over an area that will be affected by a flood occurring in the
Missouri River System, as determined by the Chief of Engineers
in an upper decile determination.
(2) Annual operating plan.--The term ``annual operating
plan'' means a plan prepared by the Chief of Engineers that
describes potential water conditions scenarios for the Missouri
River System for a year.
(3) Upper decile determination.--The term ``upper decile
determination'' means a determination that runoff conditions in
the Missouri River System are likely to reach the upper decile
scenario specified for a year in an annual operating plan.
(4) Upper quartile determination.--The term ``upper
quartile determination'' means a determination that runoff
conditions in the Missouri River System are likely to reach the
upper quartile scenario specified for a year in an annual
operating plan.
<all>
Introduced in House
Introduced in House
Referred to the House Committee on Transportation and Infrastructure.
Referred to the Subcommittee on Water Resources and Environment.
Llama 3.2 · runs locally in your browser
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line