Authorizes the Secretary of the Interior to engage in feasibility studies of the following projects: (1) Hungry Horse powerplant enlargement and reregulating reservoir, Montana; (2) Palisades powerplant enlargement, Idaho; (3) Boise power and modification study, Idaho and Oregon; (4) enlarged Shasta Laka investigation, California; (5) Whiskey Town powerplant study, California; (6) Friant powerplants study, California; (7) San Francisco Bay Area waste water reclamation project, California; (8) San Joaquin Valley drainage investigation, California; (9) Delta overland water service facilities, California; (10) Chino Valley project, Arizona; (11) Canyon Ferry powerplant, Montana; (12) Yellowtail Afterbay powerplant investigation, Montana; (13) North Platte River hydroelectric power study, Wyoming; (14) Wind-Hydroelectric energy project, Wyoming; (15) Lake Meredith salinity project, New Mexico and Texas; (16) Colorado-Big Thompson powerplants, Colorado; and (17) Red Bluff diversion dam powerplant, California.
Introduced in Senate
Referred to Senate Committee on Energy and Natural Resources.
Llama 3.2 · runs locally in your browser
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line