Vietnam Veterans Memorial Visitor Center Deadline Enforcement Act - Amends federal law which authorized construction of a Vietnam Veterans Memorial Visitor Center (Center) in Washington, D.C. to require: (1) the Center to be located underground in the triangular land area between Henry Bacon Drive, 23rd Street, Constitution Avenue, and the Lincoln Memorial; and (2) final approval for the Center no later than 30 days after the enactment of this Act.
[Congressional Bills 109th Congress]
[From the U.S. Government Publishing Office]
[S. 2419 Introduced in Senate (IS)]
109th CONGRESS
2d Session
S. 2419
To ensure the proper remembrance of Vietnam veterans and the Vietnam
War by providing a deadline for the designation of a visitor center for
the Vietnam Veterans Memorial.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
March 15, 2006
Mr. Stevens (for himself, Mr. Hagel, and Mr. Kerry) introduced the
following bill; which was read twice and referred to the Committee on
Energy and Natural Resources
_______________________________________________________________________
A BILL
To ensure the proper remembrance of Vietnam veterans and the Vietnam
War by providing a deadline for the designation of a visitor center for
the Vietnam Veterans Memorial.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Vietnam Veterans Memorial Visitor
Center Deadline Enforcement Act''.
SEC. 2. DEADLINE FOR APPROVAL OF VIETNAM VETERANS MEMORIAL VISITOR
CENTER.
Section 6 of Public Law 96-297 (16 U.S.C. 431 note; 94 Stat. 827,
117 Stat. 1348) is amended--
(1) in subsection (a), by striking paragraph (2) and
inserting the following:
``(2) Location.--The visitor center shall be located
underground in the triangular land area between Henry Bacon
Drive, 23rd Street, Constitution Avenue, and the Lincoln
Memorial in the District of Columbia.''; and
(2) by adding at the end the following:
``(e) Deadline for Approval.--Notwithstanding any other provision
of law, final approval of the visitor center shall occur not later than
30 days after the date of enactment of this subsection.''.
<all>
Introduced in Senate
Sponsor introductory remarks on measure. (CR S2206)
Read twice and referred to the Committee on Energy and Natural Resources.
Committee on Energy and Natural Resources Subcommittee on National Parks. Hearings held. With printed Hearing: S.Hrg. 109-547.
Llama 3.2 · runs locally in your browser
Ask anything about this bill. The AI reads the full text to answer.
Enter to send · Shift+Enter for new line